New built block of 8 flats in Balham

Originally this project was planned as a conversion and refurbishment of the existing building on this site. The poor condition of the existing structure, plus a fire during the early stages of the building works, made it necessary to demolish the property. A completely new building was constructed, externally closely matching the adjacent building. The new build scheme offered advantages in terms of better energy performance and more flexibility in the internal layout of the units, resulting in a scheme of 8 individually designed flats finished to a high standard.